Fiscal Qty Method Area
Year Removed Dredged Dredged
1928 1,100 ? Inner channel,upstream (IC)
1929 201,378 hydraulic pipeline Outer channel,  (OC ATF) Much of the land presently behind the dyked walls of East San
123,976        " IC Rafael was created by hydraulically fill from the San Rafael
1931 37,309        " IC Channel were creeated by spoils from tyhe San Rafael Creek.  Spoils created land includes Bay Point Lagoons as well
1933 246,193        " IC as some land on the other  side of the 580 freeway.
1935 108,045        " IC
1938 510,414        " IC When lands are created by silt or spoils deposited in creeks and
1942 101,003        " OC ATF canal, such as San Rafael Creek, it is referred to as "beneficial
1947 141,018        " OC ATF reuse."  Much of East San Rafael has been created by beneficially reused dredge spoils.
1947 42,500        " IC
1951 127,108        " OC ATF
1954 189,100        " OC ATF
1954 76,800        " IC
1962 244,449        " IC
1969 242,886        " IC
1978 152,945        " OC ATF
1980 51,599        " IC
1986 197,750 clamshell OC ATF
1987 54,275 hydraulic pipeline IC
1991 49,660 clamshell IC
1997 145,537 ATF $5.10 per cubic yard. Manson Construction & Engineering
Total I & O 3,045,045
Per yr aver I & O 48,334
Aver 5th yr I & O 253,754
Inner channel total 1,789,206
Inner channel per yr. aver 28,400
Aver 5th yr 149,101
Outer channelt, ATF total 1,255,839  
Outer channelt, ATFper yr aver 19,934
Aver 5th yr 104,653